Estacada at “Laguna Vere”,
which is now over 248 meters in length, is already finished. The new concrete
overpass was built in accordance with modern standards. Through it, vehicles
coming from Ortachala side to Heroes’ Square will be able to move smoothly. The
new overpass is equipped with concrete signage and signs on both sides.
As the City Hall
representatives stated another overpass on right bank of the river, from
Heroes’ square in direction of Digomi will be finished in the current month
too. It will allow traffic flow to move on three levels simultaneously and
reach their destination in the minimum time.
On the constructions of
overpasses currently undergoing in Tbilisi
800 people were employed.
“Construction works at
“Laguna Vere” was surveyed by Tbilisi Mayor Gigi Ugulava today. He talked to
people employed on the construction too.
internet.ge